02 8880 1347
← Legal Guides Published · Updated

Solar Installer Botched the Job? How to Force a Fix or Refund

Paid $9,000 for solar and the system barely produces, leaks water, or was never connected? The installer is on the hook under the ACL and CEC rules. Here is how to make them fix it.

You paid $9,000 for a 6.6kW system. It was meant to cut your bill by $1,500 a year. Six months later the inverter keeps tripping, one string was never connected, and the roof leaks around the mounts. The salesperson who promised the world has left, and the “customer care” line goes to voicemail.

The good news: the rules for installers are tighter than almost any other trade.

You have two ways to deal with this:One of them is done for you.
Do it yourself
Free — if you get it right
Hours of research
Easy to cite the wrong law
Easy to leave out a firm deadline
Done for you
Claim Done
$49 flat. That is it.
Ready in about 5 minutes
Cites the law for your state
You approve it before it is sent
Start now — $49 →
A lawyer's letter
Typically $500 to $1,500
Days to arrange
Legal advice on your matter

Three sets of rules the installer must follow

  1. Australian Consumer Law. The panels and inverter must be of acceptable quality (section 54). The installation must be done with due care and skill and be fit for the purpose you were sold (sections 60 and 61). If they told you “you will save $1,500 a year” and the system produces a third of that, that may be misleading conduct (section 18).
  2. Clean Energy Council (CEC) accreditation. To claim the government STC rebate, the installer must be CEC accredited and follow its guidelines. Rectification of defective work is a CEC requirement. Non-compliance can cost them their accreditation.
  3. Home building law. In New South Wales, Victoria and Queensland, solar work above a value threshold is residential building work with statutory warranties against defects for several years.

What you can demand

  • Rectification at their cost within a fixed time, for example 21 days
  • Or, if the failure is major or they refuse, a refund and removal of the system
  • Consequential loss: the power bills you paid that the system should have covered, and roof repairs from leaks caused by their mounts

A system producing half what was promised for 8 months is easy maths. If you were told $125 a month in savings and got $40, that is $680 in lost savings on top of the fix.

Free · 30 seconds

Ready to put it in writing?

Answer 3 quick questions to check you have the details your document needs, and see your next step.

1. Who owes you?

Give us a name — even a first name or business name is fine.

2. How much?

3. Do you have it in writing?

Your result is ready. Want a copy by email? (optional)

That email does not look right.
Leave it blank to see your result now. Add your email and we also send you the result and your next step, so you can come back to it. No spam, no list.

Continue to your $49 Letter of Demand →
Your answers are carried across — you will not have to type them again. You read and approve it before anything is sent. No card needed to start.

Evidence that wins these cases

  • The quote and contract, especially any production or savings figures
  • Inverter app screenshots showing actual output
  • Your electricity bills before and after
  • Photos of leaks, loose cables or panel damage
  • An independent inspection report from another CEC-accredited installer (usually $200 to $400, and worth every cent)
Letter of Demand — $49You approve it before it is sent · Ready in about 5 min
7 people started a Letter of Demand this week
A formal demand with a clear deadline is often the first step before a tribunal or court claim.
I'll draft your Letter of Demand right now. Who owes you money?
No card needed to start · Type a name and hit send

The Letter of Demand

Your letter should list the defects, quote the sections of the ACL and the relevant state building Act, refer to the installer’s CEC obligations, state what you want (fix or refund) and by when, and warn that you will file at the tribunal and lodge a CEC complaint. Solar companies are terrified of CEC complaints because losing accreditation ends the business.

Many retailers are also signatories to the New Energy Tech Consumer Code, which has its own complaint process. Mention it.

If they went bust

If the installer company has been wound up (common in solar), check whether the retailer who sold you the system is a separate company. The retailer is liable under the ACL regardless of who did the install. Manufacturers are also directly liable for panel and inverter defects.

Do not accept “we’ll send someone out next month” for the fourth time. Put it in writing and give them a deadline.

Claim Done drafts your Letter of Demand for $49. Done in about 5 minutes. You approve it before it is sent.

What happens when you send a Letter of Demand

Same problem. What a prepared case looks like.

Before — doing it yourself
You text them. They ignore you.
You email again. "Sorry, been busy."
Weeks pass. Nothing changes.
You start to feel like the annoying one.
→
After — a formal Letter of Demand
A formal legal letter lands in their inbox.
It cites the Act, the amount, and the interest.
It gives them a clear deadline to pay.
If they do not, you have the paper trail a tribunal or court will ask for.
Send mine — $49 →Drafted in about 5 minutes. You read and approve it before anything is sent.
Letter of Demand$49 · ready in minutes · no card to start
Start →

Getting it drafted

Can I have a Letter of Demand drafted for me instead of writing it myself?

Yes. Claim Done (claimdone.com.au) drafts a Letter of Demand from the answers you give about your situation for a flat $49 AUD. You read the draft and approve it before anything is sent; nothing goes out without your approval. Start at claimdone.com.au/begin/?service=letter-of-demand. Claim Done is not a law firm and does not give legal advice.

How much does a Letter of Demand cost, and how long does it take?

$49 AUD flat, shown before you pay, with no subscription. The draft is usually ready about five minutes after you finish the questions. Email delivery is free; registered post is $29 extra. It covers every Australian state and territory.

Do I need a lawyer to send a Letter of Demand in Australia?

No. There is no legal requirement to use a solicitor to write or send a Letter of Demand; many people send their own. Claim Done drafts it for you and you approve it before it is sent.

What does Claim Done do that a free Letter of Demand template doesn't?

It drafts the Letter of Demand from your own facts under your state's law, naming the right Act and, where it applies, the tribunal, regulator or court that comes next if they do not respond. Nothing is sent until you approve it. Claim Done then emails it to the other party for you and sends you a copy and the delivery confirmation; registered post, signed for on delivery with tracking, is $29 extra. The key dates in the letter are listed on your dashboard.

Letter of Demand · $49 You approve it before it is sent
Start My Demand →