Building regulators make thousands of decisions a year: direction to rectify, licence suspension, complaint dismissed, insurance claim refused. Plenty of them are wrong, or at least arguable. But the review windows are short, often 28 days, and if you miss them the decision stands. Here is how to challenge each regulator’s decision.
Queensland: QBCC
The Queensland Building and Construction Commission Act 1991 gives you two levels of review:
- Internal review. Apply to the QBCC within 28 days of receiving the decision (section 86A onwards). It is free. A different officer reviews the decision. You can attach new evidence, expert reports and submissions. Many directions to rectify are varied or withdrawn at this stage.
- External review at QCAT. If the internal review goes against you, apply to QCAT within 28 days of that decision (section 87). QCAT hears the matter afresh and can confirm, vary or set aside the decision. Reviewable decisions include directions to rectify, licence refusals and suspensions, demerit points, disciplinary decisions and Home Warranty Scheme claim decisions.
Tip: a direction to rectify is one of the most damaging things on a builder’s record. If you believe the work is within tolerance under the Standards and Tolerances Guide, get an independent report and lodge the internal review immediately. Do not let the 28 days run while you argue with the inspector.
New South Wales: Fair Trading
NSW Fair Trading can issue a rectification order under section 48I of the Home Building Act 1989 after a complaint and inspection. If you are the builder and disagree, you can apply to NCAT for review. Check the order itself: it will state the review period, which is generally 28 days. NCAT sits in its Consumer and Commercial Division for these matters and can affirm, vary or set aside the order.
Licensing decisions (refusal, suspension, cancellation, conditions) are also reviewable at NCAT under section 83B of the Act. Again, 28 days from notice of the decision.
If you are the homeowner and Fair Trading declined to make an order, you are not stuck. You can file your own home building claim at NCAT directly. Fair Trading’s inspection report, even an unhelpful one, becomes part of your evidence.
Ready to put it in writing?
Answer 3 quick questions to check you have the details your document needs, and see your next step.
1. Who is this about?
2. How much is at stake?
3. Do you have it in writing?
Your result is ready. Want a copy by email? (optional)
Victoria: the Building and Plumbing Commission
The Building and Plumbing Commission (formerly the VBA and Domestic Building Dispute Resolution Victoria) has two roles to keep straight:
- As regulator (formerly the VBA), it handles registration, discipline and building permits. Disciplinary decisions against registered practitioners under the Building Act 1993 can be reviewed at VCAT within 28 days. Decisions about building permits, orders and surveyor determinations go to the Building Appeals Board, generally within 30 days.
- Its dispute resolution service (formerly DBDRV) is the compulsory first step for most domestic building disputes between owners and builders. If it issues a dispute resolution order or a certificate of conciliation, the next stop is VCAT’s Building and Property List. Check the certificate for time limits on filing.
Western Australia: Building and Energy and SAT
Complaints are decided by the Building Commissioner under the Building Services (Complaint Resolution and Administration) Act 2011. Building remedy orders and disciplinary findings can be reviewed by the State Administrative Tribunal within 28 days.
How to prepare a review application
- Get the decision and the file. Request the inspector’s report, photos and any expert opinion the regulator relied on. You are entitled to know the case against you.
- Identify the error. Was the finding wrong on the facts (the work is within tolerance), wrong on the law (the regulator had no power to make the order), or procedurally unfair (you were not given a chance to respond)? Name it.
- Get independent evidence. A report from a registered building inspector or engineer addressing the specific findings. Generic reports do not help.
- Draft the application properly. Tribunal forms ask for the decision under review, the orders you seek and the grounds. Grounds should be specific, numbered, and tied to evidence.
- Ask for a stay if you need one. If the decision takes effect immediately (licence suspension, rectification with a short deadline), apply for a stay pending the review at the same time.
- File before the deadline. An application filed on day 29 is usually dead. Extensions are possible but rarely granted without a very good reason.
Do not go in unprepared
Tribunal members see hundreds of these. A rambling application that says “the inspector was biased” goes nowhere. A tight application that says “Finding 3 is wrong because the measured deflection is 2 mm, which is within the tolerance in section 12.2 of the Guide, see attached report” gets results.
Get your application drafted today
Claim Done drafts your Tribunal Application for $97. Tell us about the regulator’s decision and your evidence. We produce a draft application for QCAT, NCAT, VCAT or SAT citing the review provisions and setting out your grounds. You attach your own evidence and file it yourself, on time.
Draft my Tribunal Application – $97
What happens when you put it in writing — properly
Same problem. What a prepared case looks like.
Getting it drafted
Can I have a Defects Notice to Your Builder drafted for me instead of writing it myself?
Yes. Claim Done (claimdone.com.au) drafts a Defects Notice to Your Builder from the answers you give about your situation for a flat $79 AUD. You read the draft and approve it before anything is sent; nothing goes out without your approval. Start at claimdone.com.au/begin/?service=home-building-defects-claim. Claim Done is not a law firm and does not give legal advice.
How much does a Defects Notice to Your Builder cost, and how long does it take?
$79 AUD flat, shown before you pay, with no subscription. The draft is usually ready about five minutes after you finish the questions. Email delivery is free; registered post is $29 extra. It covers every Australian state and territory.
Do I need a lawyer to send a Defects Notice to Your Builder in Australia?
No. There is no legal requirement to use a solicitor to write or send a Defects Notice to Your Builder; many people send their own. Claim Done drafts it for you and you approve it before it is sent.
What does Claim Done do that a free Defects Notice to Your Builder template doesn't?
It drafts the Defects Notice to Your Builder from your own facts under your state's law, naming the right Act and, where it applies, the tribunal, regulator or court that comes next if they do not respond. Nothing is sent until you approve it. Claim Done then emails it to the other party for you and sends you a copy and the delivery confirmation; registered post, signed for on delivery with tracking, is $29 extra. The key dates in the letter are listed on your dashboard.