Subcontractor Not Paid? Security of Payment Claims by State (Australia 2026)

Last updated · Reviewed by the Claim Done team · Not legal advice

An unpaid subcontractor can serve a payment claim under the state’s security of payment Act. If the builder does not reply with a payment schedule in time (10 business days in NSW, Victoria, the ACT and Tasmania; 15 in Queensland, SA and WA), the full amount becomes payable. Claim Done prepares the Security of Payment Claim for A$49.

Security of Payment Claim: A$49, flat fee
  • A statutory payment claim under your state’s Security of Payment Act, built from your contract and invoice.
  • It sets out the response period and what follows if no payment schedule comes back.
Claim Done is a document preparation service, not a law firm, and does not give legal advice.
Option Cost What you get
Do it yourself Free Prepare the payment claim yourself from your state regulator’s guidance; adjudication and court fees apply if it goes further.
Claim Done A$49 A statutory payment claim under your state’s Security of Payment Act, built from your contract and invoice.
A solicitor Varies; ask for a quote Advice on your own situation, and documents prepared by a lawyer.

Yes. If a builder or head contractor hasn’t paid you, your state’s security of payment Act gives you a fast way to force the issue. Serve a written payment claim. If they don’t reply with a payment schedule in time (10 business days in NSW, Victoria, the ACT and Tasmania; 15 in Queensland, SA and WA, or sooner if your contract says), they become liable for the full amount and you can sue for it as a debt or go to adjudication. Watch the claim window: in NSW only work done in the past 12 months can be claimed.

You have two ways to deal with this:One of them is done for you.
Do it yourself
Free — if you get it right
Hours of research
Easy to cite the wrong law
Easy to leave out a firm deadline
Done for you
Claim Done
$49 flat. That is it.
Ready in about 5 minutes
Cites the law for your state
You approve it before it is sent
Start now — $49 →

Subcontractor not paid: what are your rights?

Every Australian state and territory has a security of payment law for the building and construction industry. The NSW Government sums up the core right: “All contractors doing construction work or providing goods or services under a construction contract have the right to receive ‘progress payments'”, and that applies “whether a contract is verbal, written or absent, and even if a contract states the contractor cannot claim progress payments”. The Victorian regulator describes its Act as “a fast and inexpensive process to recover payments … without the need for lawyers to become involved”.

The process is similar in most states:

  1. You serve a payment claim on the party that engaged you (the respondent): the builder, head contractor, developer or principal.
  2. The respondent must pay by the due date, or reply with a payment schedule saying what it will pay and why it won’t pay the rest, within a short statutory deadline.
  3. If it misses the deadline, it is liable for the whole claim. In NSW you can then go to court for judgment, and the respondent “cannot raise a defence based on the construction contract or a cross-claim”.
  4. If it schedules less than you claimed, or doesn’t pay, you can apply for adjudication: an independent adjudicator decides the amount quickly, on paper, and the decision can be turned into a court judgment.

Who can use it: subcontractors and trade contractors, suppliers of materials, plant and equipment hirers, and consultants such as engineers and designers, as well as head contractors claiming from a principal. “Pay when paid” clauses do not protect the builder: in Victoria they “have no effect”, and in Queensland they “are void under the BIF Act”.

The deadlines are strict and are the most common way subcontractors lose these rights. Read the state section below before you serve anything.

Builder won’t pay the subcontractor: the most common situations

  1. “We haven’t been paid by the client yet.” Not a reason to withhold your payment where pay-when-paid clauses are void. Serve a payment claim and let the deadlines run.
  2. Silence after your invoice. An ordinary invoice may not trigger the Act. In NSW and Victoria your claim must meet the Act’s form rules (in Victoria it must state it is made under the Act); in Queensland your usual tax invoice can be a payment claim if it identifies the work, states the amount and requests payment.
  3. Back-charges and “defective work” deductions. The builder must put every reason in its payment schedule. In NSW a respondent “cannot raise any defence, set off, cross-claim, or other reasons for not paying that you did not include in the payment schedule”.
  4. Disputed variations. Claim them, with your evidence of the instruction. The adjudicator decides what is payable.
  5. Retention money not released. NSW allows a claim for “cash security and retention money”, and Victoria’s Act lets you claim release of a performance security.
  6. Final payment after you leave site. NSW lets you claim “the final payment, at the end of a contract”; Queensland allows a final claim up to 28 days after the end of the last defects liability period if that is later than the other limits.
  7. The builder is going broke. Move fast. A statutory demand (if the builder is a company and the debt is undisputed) and the NSW payment withholding request and Contractors Debts Act route are covered below.
  8. Contract terminated. Check your state’s rules on the claim date: Queensland’s BIF Act, for example, has specific rules for the reference date when a contract is terminated.
Free · 30 seconds

Ready to put it in writing?

Answer 3 quick questions to check you have the details your document needs, and see your next step.

1. Who owes you?

Give us a name — even a first name or business name is fine.

2. How much?

3. Do you have it in writing?

Your result is ready. Want a copy by email? (optional)

That email does not look right.
Leave it blank to see your result now. Add your email and we also send you the result and your next step, so you can come back to it. No spam, no list.

Continue to your $49 SOPA Payment Claim →
Your answers are carried across — you will not have to type them again. You read and approve it before anything is sent. No card needed to start.

Security of payment deadlines in each state

These are the maximum periods in each Act. Your contract can set a shorter period for the payment schedule, and the shorter period then applies, so check your contract first.

State Act Payment schedule due Key claim or adjudication deadline Regulator
NSW Building and Construction Industry Security of Payment Act 1999 10 business days after the claim Claim work done in the past 12 months; adjudication 10 business days after a short schedule Building Commission NSW, 13 32 20
VIC Building and Construction Industry Security of Payment Act 2002 10 business days after receiving the claim Claim by 6 months after practical completion (or a later contract date); adjudication 10 business days after a short schedule Building and Plumbing Commission, 1300 067 088
QLD Building Industry Fairness (Security of Payment) Act 2017 15 business days after the claim is given Claim within six months after completion (or a later contract date); adjudication 30 business days after a disputed schedule QBCC, 139 333
WA Building and Construction Industry (Security of Payment) Act 2021 15 business days after receiving the claim A claim to a homeowner needs a homeowner’s notice attached Building and Energy, 1300 489 099
SA Building and Construction Industry Security of Payment Act 2009 15 business days after the claim is served Does not cover domestic building work on the owner’s home Small Business Commission SA, 1800 072 722
TAS Building and Construction Industry Security of Payment Act 2009 10 business days (20 for a residential home owner) Adjudication 10 business days after a disputed schedule Building Standards Tasmania
ACT Building and Construction Industry (Security of Payment) Act 2009 10 business days after the claim is given Payment due 15 business days after the claim unless the contract says earlier ACT Planning, 13 22 81
NT Construction Contracts (Security of Payments) Act 2004 Different model: no payment schedule; a payment dispute arises when a claim is rejected, disputed or not paid in full when due Apply for adjudication within 65 working days after the dispute arises The Act (NT legislation), (08) 8924 7608

NSW in more detail

Unless your contract says earlier, payment is due 20 business days after the claim for a subcontractor (10 business days for a subcontractor doing exempt residential work, and 15 for a head contractor claiming from the principal). A contract can set earlier dates “but not later”. If you’re paid late, you can claim interest at the contract rate or the court rate, whichever is greater. If you’re working on a residential job, your claim must include the statement: “This is a payment claim made under the Building and Construction Industry Security of Payment Act 1999 NSW”. Questions go to Securityofpayment@customerservice.nsw.gov.au. Note that “Building Commission NSW does not recover money owed to a person”; it runs the scheme, it doesn’t collect for you.

Victoria in more detail

Your claim must say: “This is a payment claim under the Building and Construction Industry Security of Payment Act 2002”. Contracts directly between a builder and the home owner are not covered, but “contracts between a home owner’s building contractor and any subcontractor or supplier are covered”, so a subcontractor on a house job can still use the Act against the builder. If the builder gives no schedule, you must give written notice of intention to apply for adjudication, and the builder then has 5 business days to provide one. In adjudication, “legal representation is not allowed unless the adjudicator permits it”. Enquiries: sopenquiry@bpc.vic.gov.au.

Queensland in more detail

If the contract doesn’t set a due date, payment is due 10 business days after the claim. Under the QBCC Act, subcontract payment terms can’t exceed 25 business days. Not paying the full amount by the due date, without giving a payment schedule, is an offence: “a penalty of up to 100 penalty units applies”. If you have received neither payment nor a schedule, you can lodge a monies owed complaint with the QBCC. Adjudication applications go to the QBCC Adjudication Registry, with registry fees from $68.77 for a claim of no more than $11,345.70 (plus the adjudicator’s fees), and the registrar refers them to an adjudicator within 4 business days. Adjudication isn’t available for domestic building work under a contract with the resident owner.

What you can claim

  • The value of the construction work done, or goods and services supplied, under the contract, up to the claim date.
  • Approved and disputed variations, with your evidence of the instruction.
  • Unpaid amounts from earlier claims. In NSW, “If money has not been paid for a previous claim, this can be included in the next claim.”
  • Retention money and securities when they are due for release.
  • Interest on late payment, where your contract or the Act provides for it (in NSW, the greater of the contract rate and the court rate).

Example (round numbers, for illustration only): a tiler on a NSW apartment job invoices the builder $18,000 for work done in July. The builder replies two weeks later, by email, that it will pay $10,000 because of “workmanship issues”, with no detail. If that reply came more than 10 business days after the claim was served, or never came at all, the builder is liable for the full amount on the due date. If it was a valid schedule served in time, the tiler can apply for adjudication of the $8,000 difference within 10 business days of receiving it.

Evidence to gather

  1. Your subcontract, quote, purchase order or the messages that formed the agreement, including the payment terms.
  2. Each invoice or payment claim, with the date and method it was served.
  3. Site records: timesheets signed by the foreman, delivery dockets, daily diaries, photos with dates.
  4. Variation instructions: emails, texts, site instructions or a foreman’s note.
  5. The builder’s payment schedule, if any, and the date you received it.
  6. The respondent’s exact legal name, ABN or ACN, and address for service.
  7. A calendar of business days counting from the date your claim was served, so you don’t miss a deadline.

How to get paid as a subcontractor: 5 steps

Step 1: Check your contract and the date of your last work

Find the payment terms, any contract date for claims, and the date you last did work. Those dates decide whether you are still within the claim window (12 months in NSW, six months after completion in Victoria and Queensland, unless the contract allows later) and what due date applies. Ask the builder in writing for payment of anything already overdue.

Step 2: Serve a valid security of payment claim

Serve a payment claim that meets your state’s Act: identify the work, state the amount, request payment, and include the statement your state requires. Serve it in a way the contract or the Act allows and record the date it was received. Our Security of Payment Claim applies your state’s Act and lists the work, invoices and variations in a schedule. If the job was domestic building work for a home owner in a state where the Act doesn’t apply to that contract, use our Letter of Demand ($49) instead.

Serve a Security of Payment Claim – $49

Step 3: Count the business days

Count the payment schedule deadline from the date the respondent received your claim. If no schedule arrives in time and you aren’t paid by the due date, the full amount is owed. In NSW you can then go to court “immediately or within the next 6 years” for judgment for the full claim, or start adjudication by giving notice of intention within 20 business days of the due date. You may also give written notice that you will suspend work; in NSW you can suspend “two business days after the notice has been given”.

Step 4: Apply for adjudication if the schedule is short or unpaid

Adjudication is run through an Authorised Nominating Authority (in Queensland, the QBCC Adjudication Registry). There is no Claim Done product for the adjudication application itself; the authority provides the form. Apply within your state’s window: 10 business days after a short schedule in NSW and Victoria, 30 business days after a disputed schedule in Queensland, 10 business days after a disputed schedule in Tasmania, and 65 working days after the dispute arises in the NT. Include the claim, the schedule, the contract and all your supporting evidence. In NSW the adjudicator has 10 business days to decide after notifying both parties that the application has been accepted, and the respondent must pay any amount due by the date set in the decision.

Step 5: Enforce, or use a demand if security of payment isn’t available

If the adjudicated amount isn’t paid, file the adjudication certificate in court; in Victoria the adjudicated amount then “will become a judgment debt”. If you are outside the claim window or the Act doesn’t apply, send a Letter of Demand ($49) and then claim the debt in court or a tribunal. If the builder is a company and the debt is undisputed and at least $4,000, a statutory demand gives it 21 days to pay; don’t use one where the builder has a genuine dispute about the amount, because the court can set it aside.

Prepare a statutory demand – $97

SOPA Payment Claim — $49You approve it before it is sent · Ready in about 5 min
9,401 people visited ClaimDone in the past 30 days
A formal demand with a clear deadline is often the first step before a tribunal or court claim.
I'll draft your SOPA Payment Claim right now. Who owes you money?
No card needed to start · Type a name and hit send

When security of payment doesn’t help, and what to do instead

  • You worked directly for a home owner. In Victoria, contracts between a builder and the home owner are not covered; in Queensland adjudication isn’t available for domestic building work with the resident owner; in SA the Act does not apply to domestic building work on premises the owner lives in or plans to live in. Tasmania and WA differ: Tasmania gives a residential home owner 20 business days for a schedule, and in WA a claim to a homeowner needs a homeowner’s notice. Where it doesn’t apply, use a letter of demand and a debt claim.
  • You missed the window. Your contract debt doesn’t disappear. Claim it as an ordinary debt: six years for contract claims in every state except the NT, where it is three years.
  • The builder is a company in trouble. Act quickly. In NSW, after applying for adjudication, a claimant can serve a payment withholding request so a principal holds back money owed to the builder, and can use the Contractors Debts Act 1997 to recover from the principal.

Where an ordinary debt claim goes

If you claim the debt outside the security of payment process, it goes to the usual civil forum. NSW: the Local Court (Small Claims Division up to $20,000, General Division up to $100,000). Victoria: the Magistrates’ Court, up to $100,000. Queensland: QCAT for minor civil disputes up to $25,000, including disputes “between two traders” about goods or services, or the Magistrates Court up to $150,000. Other states: see our guide on how to sue someone in Australia. NCAT and VCAT cannot decide disputes between residents of different states, but claims against a company are not affected.

Prepare your tribunal application – $97

In NSW, WA, SA and Tasmania the same product prepares your court claim.

After you win: getting paid

An adjudication certificate filed in court, a court judgment, or a tribunal order can all be enforced if the builder still doesn’t pay: a garnishee order on the builder’s bank account or on money owed to it, seizure and sale of property, or an examination of its finances.

Tribunals do not collect the money for you. In NSW, Victoria, Queensland, the ACT and the NT, an unpaid tribunal money order is first registered, recorded or filed with a court. In WA, SA and Tasmania the Magistrates Court decides the claim, so you already have a court judgment. Then you apply for the court’s enforcement tools.

State How the order becomes enforceable Garnishee: bank account and wages Other options
NSW Get a certified copy of the NCAT order (no fee) and register it with the Local Court (filing fee applies) Yes: Form 69 with Form 70 (bank) or Form 71 (wages); no filing fee Writ for the levy of property (Forms 65, 66); examination notice (Form 51 or 52)
VIC Ask VCAT to have the order recorded at the Magistrates’ Court Yes: attachment of debt (Form 71A or 71B); attachment of earnings (Forms 72A, 72B, with a hearing) Warrant to seize property (Form 68A); oral examination (Form 67A); instalment order
QLD File the QCAT order and an affidavit with a court (the Magistrates Court up to $150,000) within six years; free Yes: enforcement warrant for redirection of debt (Form 76 or 77) or of earnings (Form 78), with Forms 9 and 74 Seizure and sale (Form 75); enforcement hearing
ACT File the sealed ACAT order and an affidavit in the Magistrates Court, serve Form 2.49, wait 7 days Yes: debt redirection (Form 2.62 or 2.63); earnings redirection (Form 2.64) Seizure and sale (Form 2.59); enforcement hearing (Forms 2.50, 2.51)
NT Register the NTCAT order with the Local Court (certified copy and affidavit; no fee) Yes: attachment of debts order; attachment of earnings order with a protected earnings rate Warrant of seizure and sale; examination summons; charging order
WA Already a court judgment; apply with Form 6 and the fee Yes: debt appropriation order (Form 6, Form 2 affidavit); earnings appropriation order (individuals only, after an instalment order is broken) Property (seizure and sale) order; means inquiry
SA Already a court judgment; start through CourtSA, Enforcement tab Yes: garnishee order (draft Form 148); wages protected to 90% of the weekly national minimum wage Warrant of sale (Form 163); investigation or examination summons
TAS Already a court judgment; file enforcement process at the registry ($49) Yes: provisional, then final, garnishee order attaching a debt or earnings Warrant to sell property; judgment summons and oral examination

Enforce your order – $97

Questions people ask

What can a subcontractor do if the builder won’t pay?

Serve a payment claim under your state’s security of payment Act. If the builder doesn’t reply with a payment schedule in time, it becomes liable for the full amount and you can sue for it or apply for adjudication. Our Security of Payment Claim ($49) applies your state’s rules and deadlines.

How long does a builder have to respond to a payment claim?

Ten business days in NSW, Victoria, the ACT and Tasmania (20 for a Tasmanian home owner), and 15 business days in Queensland, South Australia and Western Australia, or a shorter time if the contract says so. If no payment schedule is given in time, the builder is liable for the whole claim. The NT works differently, with no payment schedule step.

Do I need a written contract to make a security of payment claim?

No. The NSW Government says the right to progress payments applies “whether a contract is verbal, written or absent”, and the Victorian regulator says the contract “may be oral, written or a combination of both”. Messages, quotes and site instructions can prove what was agreed.

Can the builder refuse to pay because the client hasn’t paid them?

Not on the strength of a “pay when paid” clause. In Victoria those clauses “have no effect”, and in Queensland they “are void under the BIF Act”. The builder’s dispute with its own client is not an answer to your claim.

Does my tax invoice count as a payment claim?

In Queensland it can, if it identifies the work, states the amount and requests payment. In Victoria the claim must also state that it is made under the Act, and in NSW a subcontractor on a residential job must include the prescribed statement. To be safe, serve a claim drafted to your state’s Act.

How long do I have to make a payment claim?

In NSW, only work completed in the past 12 months can be claimed. In Victoria the latest time is generally 6 months after practical completion, or a later contract date. In Queensland it is six months after the work is completed, or later for a final claim. After that, claim the money as an ordinary debt.

What is adjudication and how much does it cost?

An independent adjudicator decides how much is payable, usually on written submissions. You apply through an Authorised Nominating Authority, or in Queensland the QBCC registry, where the registry fee starts at $68.77. You pay the adjudicator’s fees too; in NSW the parties pay them equally unless the adjudicator decides otherwise.

Can I stop work if I’m not paid?

Yes, if you follow the Act. In NSW, if you haven’t been paid by the due date, you can serve written notice of your intention to suspend, then suspend “two business days after the notice has been given”, and the respondent cannot claim damages for it. Check your own state’s Act for its notice period before suspending.

Can I send a statutory demand to a builder who owes me money?

Yes, if the builder is a company, the debt is due and payable, it is at least $4,000, and it is not genuinely disputed. The company has 21 days to pay or apply to set it aside. Our Statutory Demand ($97) prepares it.

Who do I contact about security of payment in my state?

NSW: Building Commission NSW, 13 32 20. Victoria: the Building and Plumbing Commission, 1300 067 088. Queensland: the QBCC, 139 333. WA: Building and Energy, 1300 489 099. SA: the Small Business Commission, 1800 072 722. ACT: 13 22 81. The regulators explain the process; they don’t collect the money for you.

The builder has gone broke. Can I still get paid?

Act fast. If it is still trading, serve your claim and use the deadlines. In NSW you can serve a payment withholding request on the principal after applying for adjudication, and use the Contractors Debts Act 1997 to recover from the principal. If the company is already in liquidation, get advice about lodging a claim with the liquidator.

Related guides

Sources

All sources checked 26 November 2026.

Claim Done is not a law firm and does not give legal advice. This page is general information. For a complex or high-value matter, speak to a lawyer or a free community legal centre.

What happens when you send a SOPA Payment Claim

Same problem. What a prepared case looks like.

Before — doing it yourself
You text them. They ignore you.
You email again. "Sorry, been busy."
Weeks pass. Nothing changes.
You start to feel like the annoying one.
→
After — a formal SOPA Payment Claim
A formal legal letter lands in their inbox.
It cites the Act, the amount, and the interest.
It gives them a clear deadline to pay.
If they do not, you have the paper trail a tribunal or court will ask for.
Send mine — $49 →Drafted in about 5 minutes. You read and approve it before anything is sent.

What our clients say

5.09 Google reviews
The team provided helpful support and maintained clear communication throughout the process. Everything was explained in a straightforward way, making the experience easy to follow.
Fabrice L. Google review · November 2026
Really good service with a professional approach and clear communication. The experience was pleasant, and the attention to detail stood out.
Catherina D. Google review · October 2026
The service was professional and the overall experience was smooth. Communication was clear, and everything was handled efficiently.
Ricardo R. Google review · October 2026
Very satisfied with the experience. The process was straightforward, communication was clear, and the support was professional throughout. Highly recommended!
Doris B. Google review · October 2026
Excellent service and a smooth overall experience. The team is professional, helpful, and responsive. Everything was handled efficiently, and the quality of service was impressive.
Dorothy D. Google review · October 2026
Had several contracts that needed reviewing and the service made everything much easier. Documents were handled securely, feedback was clear, and the completed work was delivered promptly.
Linda M. Google review · October 2026
We used the service for a lease review and found the process very straightforward. They handled the paperwork efficiently, highlighted important points and delivered everything when promised.
Audrey M. Google review · October 2026
The debt collection process was handled professionally and efficiently. Communication was clear, documents were managed properly, and we always knew what stage everything was at.
Ashley S. Google review · October 2026
Really impressed with how smoothly they handled our contract review. The documents were organised properly, delivered promptly, and the whole process was explained clearly from start to finish.
Lucille D. Google review · October 2026