To ask your landlord for a repair, put it in writing to the landlord or the agent: what is broken, where, when you first noticed it, whether it is urgent, and the date you would like it fixed by. The written request matters more than most renters realise, because in Victoria the 14-day clock for a non-urgent repair only starts once you ask in writing, and in the Northern Territory a verbal request is not enough if you later need to enforce it. Only five states and territories publish a fixed time frame on their official pages; New South Wales, Queensland and South Australia do not, which makes the date in your own letter the one that counts.
Claim Done writes that request. The Repair Request to Landlord or Agent costs a flat A$29. It describes the problem, says how it affects you, asks for the repair by a clear date, offers access for a tradesperson and, where your state’s tenancy authority publishes a time frame, quotes it. You read it first, and it is only emailed once you approve it.
Why does a repair request need to be in writing?
A phone call gets forgotten; an email or letter has a date on it. The official pages go further than “good practice” in several places.
- Victoria: Consumer Affairs Victoria says renters must tell the rental provider or property manager about repairs in writing as soon as possible, and that rental providers must make non-urgent repairs “within 14 days of getting a written request”.
- Northern Territory: the Northern Territory Government’s repairs page says you can give notice verbally, but if the repairs are not done you must give written notice before you can enforce your tenancy agreement.
- Queensland: the Residential Tenancies Authority says it is the tenant’s responsibility to tell the property manager or owner about a routine repair in writing as soon as possible. For emergency repairs a phone call is enough, though the RTA suggests a follow-up email or text.
- Western Australia: Consumer Protection says non-urgent repairs must be requested in writing, by email, letter or its Form 23.
- South Australia: the state government’s page tells tenants to ask for non-urgent repairs in writing, using its request for repairs form.
- New South Wales: the New South Wales Government says to tell the landlord or agent in writing what needs fixing and by when, with a clear deadline.
So in every state the written request is either required or the recommended first step. It is also the document every next step relies on.
What counts as an urgent repair?
Each state keeps its own list, but they overlap heavily: a failure of water, gas or electricity, hot water, cooking or heating; a burst pipe or serious roof leak; a blocked or broken toilet; a dangerous electrical fault or gas leak; and anything that makes the home unsafe or insecure.
Two differences are worth knowing. In Victoria, the urgent list on the Consumer Affairs Victoria repairs page includes “mould or damp caused by or related to the building structure”, so mould from a leaking roof or rising damp is an urgent repair there. In the Australian Capital Territory, the Government’s during a tenancy page lists the failure of a refrigerator or laundry appliance supplied with the property, and of hot water, cooking, heating or cooling, as urgent.
If you are not sure, say so. A request that describes the problem accurately and asks for it to be looked at promptly is better than one that overstates it.
Ready to put it in writing?
Claim Done drafts your letter, application, response or agreement from your answers, from A$29. You review and approve it before anything is sent or lodged. No lawyer's retainer, no subscription.
Ready to put it in writing?
Answer 3 quick questions to check you have the details your document needs, and see your next step.
1. Who is this about?
2. How much is at stake?
3. Do you have it in writing?
Your result is ready. Want a copy by email? (optional)
What are the repair time limits in each state?
This table uses only what each state’s official tenancy page says, checked on 29 September 2026. Where a page gives no number, the table says so rather than filling the gap.
| State or territory | Urgent repairs | Non-urgent repairs | Official page |
|---|---|---|---|
| Victoria | Immediately (mould or damp caused by or related to the building structure is on the urgent list) | Within 14 days of a written request | Consumer Affairs Victoria |
| Tasmania | As soon as possible after the tenant reports an essential service not working | Within 28 days of the tenant reporting it; a cooking stove within 14 days | Consumer, Building and Occupational Services |
| Australian Capital Territory | As soon as practicable | Within 4 weeks | Australian Capital Territory Government |
| Northern Territory | Emergency repairs: 5 days after notice to make the repair or arrange for it to be made within 14 days | No fixed number of days (“in a timely manner”) | Northern Territory Government |
| Western Australia | 24 hours to organise repairs to an essential service; 48 hours to organise other urgent repairs | No fixed number of days | Consumer Protection |
| New South Wales | No fixed number of days | No fixed number of days | New South Wales Government |
| Queensland | No fixed number of days | No fixed number of days (“a reasonable timeframe”) | Residential Tenancies Authority |
| South Australia | No fixed number of days | No fixed number of days (“within a reasonable time”) | South Australian Government (SA.GOV.AU) |
The Tasmanian figures come from Consumer, Building and Occupational Services; Western Australia’s from Consumer Protection’s rental home repairs page (updated 26 November 2024).
Put a single problem through the table and you see why the letter matters. A hot water system that dies on a Monday must be fixed immediately in Victoria and as soon as possible in Tasmania. In Western Australia the landlord has 24 hours to organise the repairer. In the Northern Territory they have 5 days to act. In New South Wales, Queensland and South Australia the official pages give no number at all. For renters in those three states, the date you write in your request is the only deadline on paper, which is a good reason to make it specific and reasonable rather than “as soon as possible”.
Note what the Western Australian figures measure: 24 and 48 hours to organise the repair with a suitable repairer, not to finish it. Consumer Protection adds that the landlord must make sure the repairs are carried out as soon as practicable.
What should the repair request include?
The Northern Territory page lists the details a written notice must include, and it is a good checklist anywhere: the landlord’s or agent’s name and address, the address of the property, your name, the details of the repair, and your signature and the date. Add these:
- Where and what. “Black mould on the bedroom ceiling and behind the wardrobe”, not “mould issue”.
- When you first noticed it, and whether it is getting worse.
- How it affects you. Moved a child out of a bedroom, no hot water for showers, a door that will not lock.
- Urgent or not, in your own words, and the date you would like it fixed by. Where your state has a published time frame, use it.
- Access. When a tradesperson can get in.
- Earlier reports. “I emailed the agent on 1 September 2026 and was told someone would come.”
- Photos, attached, with the date taken.
Keep threats out of the first request. Do not mention withholding rent, the bond or the tribunal. A calm request gets the repair booked, and if it does not, it becomes the best evidence you have.
What if the landlord still does not fix it?
The next step depends on your state, and several of the official pages set out a path. In Victoria, if a non-urgent repair is not done within 14 days of the written request, you can ask Consumer Affairs Victoria for a repairs inspection (your written request goes with the form) or ask Rental Dispute Resolution Victoria for help. Consumer Affairs Victoria also says renters must keep paying rent while they wait. In Queensland, the RTA describes a Notice to remedy breach (Form 11) giving at least 7 days, then its free dispute resolution service, then an application to the Queensland Civil and Administrative Tribunal for a repair order. In the Northern Territory you can apply to the Northern Territory Civil and Administrative Tribunal for an order that emergency repairs be carried out. In New South Wales, the government says that if you cannot contact the landlord or agent about an urgent repair you can arrange it yourself and be paid back up to $1,000 within 14 days of your notice. Victoria lets renters arrange an urgent repair costing $2,500 or less if the rental provider does not respond. Both come with conditions, so read the official page before you spend money.
Claim Done’s formal document for this stage is the Tenant Repair or Breach Notice (A$49), which relies on your state’s tenancy law. Our guides to what to do when the landlord won’t fix repairs and mould in a rental go further.
What does Claim Done’s Repair Request do, and what does it cost?
The Repair Request to Landlord or Agent is a flat A$29, including GST, with no subscription. You answer 9 questions: what needs fixing, whether it is urgent, who the letter is to, the rental address, a description of the problem, how it affects you, earlier reports, access for a tradesperson and the tone.
The letter describes the problem from your answers only. It does not diagnose a cause or add a health effect you did not mention. The urgency comes from your answer, never from the letter’s own judgement. Where your state publishes a time frame for your situation, it includes one sentence quoting that guidance, and it sets the requested date to match: 14 days in Victoria for a non-urgent repair, 28 days in Tasmania (14 for a cooking stove), 4 weeks in the Australian Capital Territory, and 14 days in the states that publish no number. It offers access and asks for written confirmation of when the repair will be done.
It is usually ready about five minutes after payment. You read it on your dashboard, edit it or ask for a redraft (2 edits included), and once you approve it, it is emailed to your landlord or agent; or you download it and send it yourself. Claim Done is not a law firm. It writes the request clearly and leaves the threats out.
Facts checked against the repair pages of Consumer Affairs Victoria (updated 26 February 2026), Consumer, Building and Occupational Services Tasmania (general and urgent repairs), the Australian Capital Territory Government (updated 30 January 2026), the Northern Territory Government, Consumer Protection Western Australia (updated 26 November 2024), the New South Wales Government (getting repairs done, and urgent repairs), the Residential Tenancies Authority Queensland (emergency and routine repairs) and SA.GOV.AU (updated 1 July 2026) on 29 September 2026.
Your next step: take two dated photos of the problem, note when it started, then start your Repair Request. The date on your written request is where every time limit in this guide begins.
Frequently asked questions
How long does a landlord have to do repairs in Victoria?
Consumer Affairs Victoria says urgent repairs must be made immediately and non-urgent repairs within 14 days of a written request. Mould or damp caused by or related to the building structure is on Victoria's urgent repairs list.
Is there a time limit for repairs in New South Wales or Queensland?
The official pages give no fixed number of days. The New South Wales Government says to tell the landlord in writing what needs fixing and by when, with a clear deadline, and Queensland's Residential Tenancies Authority says repairs should be made in a reasonable timeframe.
Can I just phone the agent about a repair?
For an emergency, yes, and follow it up in writing. For anything else, write. In Victoria the 14-day period runs from a written request, and in the Northern Territory you must give written notice before you can enforce your tenancy agreement.
What counts as an urgent repair?
Each state keeps its own list, but most include failures of water, gas, electricity, hot water, cooking or heating, burst pipes, serious roof leaks, broken toilets, gas leaks and anything that makes the home unsafe or insecure. Check your state's official page for the exact list.
How much does Claim Done's Repair Request cost?
A flat A$29, including GST, with no subscription. It quotes your state's official time frame where one is published. You read it first, and it is emailed only after you approve it.
What changes when it is in writing
Same situation, said once and clearly.
Getting it drafted
Can I have a Repair Request to Landlord or Agent drafted for me instead of writing it myself?
Yes. Claim Done (claimdone.com.au) drafts a Repair Request to Landlord or Agent from the answers you give about your situation for a flat $29 AUD. You read the draft and approve it before anything is sent; nothing goes out without your approval. Start at claimdone.com.au/begin/?service=rental-repair-request. Claim Done is not a law firm and does not give legal advice.
How much does a Repair Request to Landlord or Agent cost, and how long does it take?
$29 AUD flat, shown before you pay, with no subscription. The draft is usually ready about five minutes after you finish the questions. Email delivery is free; registered post is $29 extra. It covers every Australian state and territory.
Do I need a lawyer to send a Repair Request to Landlord or Agent in Australia?
No. There is no legal requirement to use a solicitor to write or send a Repair Request to Landlord or Agent; many people send their own. Claim Done drafts it for you and you approve it before it is sent.
What does Claim Done do that a free Repair Request to Landlord or Agent template doesn't?
It drafts the Repair Request to Landlord or Agent from your own facts under your state's law, naming the right Act and, where it applies, the tribunal, regulator or court that comes next if they do not respond. Nothing is sent until you approve it. Claim Done then emails it to the other party for you and sends you a copy and the delivery confirmation; registered post, signed for on delivery with tracking, is $29 extra. The key dates in the letter are listed on your dashboard.