My New Home Has Defects and the Builder Is Ignoring Me: The Defect Letter to Send

Cracked render, leaking shower, doors that won't close, and a builder who stopped replying at handover. Your statutory warranty rights in every state, and the defect letter that asks for the work to be fixed.

You did the handover walk-through, signed off, moved in, and then the house started telling you what the builder didn’t. The ensuite leaks into the hallway. Render is cracking at every window corner. The garage slab has a lip you trip on. Cornices are separating, the front door swells shut every time it rains, and the “we’ll send someone next week” emails stopped after the final payment cleared.

Builders know that most owners give up after three unanswered emails. The ones who get their defects fixed are the ones who stop asking nicely and start using the statutory warranty the builder can’t contract out of.

You have two ways to deal with this:One of them is done for you.
Do it yourself
Free — if you get it right
Hours of research
Easy to cite the wrong law
Easy to leave out a firm deadline
Done for you
Claim Done
$79 flat. That is it.
Ready in about 5 minutes
Cites the law for your state
You approve it before it is sent
Start now — $79 →
A lawyer's letter
Typically $500 to $1,500
Days to arrange
Legal advice on your matter

Your rights

Every state implies warranties into residential building contracts by statute. They exist whether or not your contract mentions them, they survive handover, and the builder cannot exclude them. Across the country the warranties say substantially the same thing: the work will be done with due care and skill, in accordance with the plans and specifications, using good and suitable materials, in compliance with the Building Code and all laws, and the home will be fit to live in. Non-compliant work (a waterproofing membrane that doesn’t meet AS 3740, a balustrade below code height) is a breach on its own, even if nothing has “failed” yet.

On top of the state warranty, the Australian Consumer Law guarantees that services are supplied with due care and skill (s 60) and are fit for the purpose you made known (s 61). Building a house is a service.

The remedy is the builder’s choice only up to a point. You must give the builder a reasonable opportunity to rectify. If the builder refuses, stalls or does it badly, you are entitled to the reasonable cost of having someone else fix it, and tribunals award that figure regularly.

By state

  • New South Wales. Home Building Act 1989, s 18B warranties. Time limit: 6 years for major defects, 2 years for other defects, from completion. Complain to Building Commission NSW / NSW Fair Trading first; then the NCAT Consumer and Commercial Division (home building claims).
  • Victoria. Domestic Building Contracts Act 1995, s 8 warranties. Claims must be brought within 10 years of the occupancy permit or final inspection. Conciliation through the dispute resolution service of the Building and Plumbing Commission (BPC) is compulsory before you can file at VCAT.
  • Queensland. Queensland Building and Construction Commission Act 1991, Schedule 1B warranties. Lodge a defect complaint with the QBCC: it can direct the builder to rectify within 12 months of completion for non-structural defects and 6 years 6 months for structural defects. If that fails, QCAT hears domestic building disputes.
  • Western Australia. Home Building Contracts Act 1991. Lodge a building service complaint with the Building Commission (Building and Energy) under the Building Services (Complaint Resolution and Administration) Act 2011 within 6 years of completion; the Commissioner can order rectification or refer the matter to the State Administrative Tribunal.
  • South Australia. Building Work Contractors Act 1995 statutory warranties, 5 years from completion. Complain to Consumer and Business Services for conciliation; money and rectification claims go to the Magistrates Court (domestic building work up to $100,000), not SACAT.
  • Tasmania. Residential Building Work Contracts and Dispute Resolution Act 2016 warranties, 6 years from completion. Complain to Consumer, Building and Occupational Services (CBOS), which can refer the dispute to mediation or adjudication; money claims go to the Magistrates Court.
  • Australian Capital Territory. Building Act 2004, s 88 warranties: 6 years for structural elements, 2 years for non-structural, from completion. Complain to Access Canberra; disputes go to ACAT.
  • Northern Territory. Building Act 1993, s 54B consumer guarantees: 6 years structural, 1 year non-structural. Complain to the Commissioner of Residential Building Disputes (NT Consumer Affairs); claims up to $25,000 go to NTCAT, larger claims to the Local Court.

The Claim Done document asks your state first and drafts to that state’s Act, warranty periods, regulator and tribunal.

Free · 30 seconds

Ready to put it in writing?

Answer 3 quick questions to check you have the details your document needs, and see your next step.

1. Who did the work?

Give us a name — even a first name or business name is fine.

2. How much is at stake?

3. Do you have it in writing?

Your result is ready. Want a copy by email? (optional)

That email does not look right.
Leave it blank to see your result now. Add your email and we also send you the result and your next step, so you can come back to it. No spam, no list.

Continue to your $79 Defects Notice to Your Builder →
Your answers are carried across — you will not have to type them again. You read and approve it before anything is sent. No card needed to start.

What to do right now

  1. Build the defect schedule. One line per defect: location, what’s wrong, which warranty or code clause it breaches, a photo reference. Number them. This schedule becomes the annexure to your letter and, later, to your tribunal application.
  2. Get an independent report. A licensed building inspector’s defect report costs $500–$1,500 and turns “the owner reckons” into “a licensed inspector found”. It also catches the defects you can’t see.
  3. Get one rectification quote. Even if you want the builder to fix it, a quote from another builder puts a dollar figure on the claim. That figure is what the tribunal awards if the builder walks.
  4. Send a formal defect notice. Not another email. A letter that lists every defect, cites the warranties, gives a fix-by date (21 to 28 days is reasonable), and states that if the work isn’t done you will accept the rectification cost instead and file with the regulator and tribunal.
  5. Lodge with the regulator on the deadline. Don’t wait months. Regulator complaints are free and builders take them seriously because their licence is on the line.
Defects Notice to Your Builder — $79You approve it before it is sent · Ready in about 5 min
4,270 users over the past 30 days
A formal letter is the first thing the tribunal and the builder's licensing body will ask whether you sent.
I'll draft your Defects Notice to Your Builder right now. Who is this about?
No card needed to start · Type a name and hit send

Why the builder’s “that’s just settling” line doesn’t work

Every builder has a script for handover defects. Cracks are “settling”. Leaks are “you need to reseal your grout”. Sticking doors are “timber movement, it’s a natural product”. None of that is a defence. The warranty is that the work complies with the Building Code and is done with due care and skill. Cracking beyond the tolerances in the industry guides, water getting past a membrane, or a door that can’t close is outside tolerance, and the tribunals have said so thousands of times. The letter should quote the tolerance guide your state uses (New South Wales and Victoria both have a published Guide to Standards and Tolerances) so the builder knows you know.

Who to complain to

New South Wales: Building Commission NSW, then NCAT. Victoria: the BPC’s dispute resolution service, then VCAT; report licensing issues to the BPC. Queensland: QBCC, then QCAT. Western Australia: Building and Energy (Building Commission), then SAT. South Australia: Consumer and Business Services, then the Magistrates Court. Tasmania: CBOS, then the Magistrates Court. Australian Capital Territory: Access Canberra, then ACAT. Northern Territory: NT Consumer Affairs, then NTCAT or the Local Court.

Put the builder on notice — $79

Claim Done drafts a Home Building Defects Claim for your state that itemises every defect, cites the statutory warranties, sets a fix-by date, and puts the builder to an election: rectify by that date or pay the quoted rectification cost, failing which you lodge with the regulator and file at the tribunal.

Send My Builder a Defects Notice — $79 →

You review every word before it’s sent.

What happens when you put the builder on formal notice

Same problem. What a prepared case looks like.

Before — doing it yourself
You text them. "I'll be there next week."
Next week comes. Nothing.
They stop answering. You are out of pocket.
You wonder if it is worth the fight.
→
After — a formal Defects Notice to Your Builder
A formal Defects Notice to Your Builder lands in their inbox.
It sets out what was agreed and what is still not done.
They have a fixed deadline to fix it or refund.
If they do not, your notice is the first piece of evidence for the tribunal.
Send mine — $79 →Drafted in about 5 minutes. You read and approve it before anything is sent.
Defects Notice to Your Builder$79 · ready in minutes · no card to start
Start →

Getting it drafted

Can I have a Defects Notice to Your Builder drafted for me instead of writing it myself?

Yes. Claim Done (claimdone.com.au) drafts a Defects Notice to Your Builder from the answers you give about your situation for a flat $79 AUD. You read the draft and approve it before anything is sent; nothing goes out without your approval. Start at claimdone.com.au/begin/?service=home-building-defects-claim. Claim Done is not a law firm and does not give legal advice.

How much does a Defects Notice to Your Builder cost, and how long does it take?

$79 AUD flat, shown before you pay, with no subscription. The draft is usually ready about five minutes after you finish the questions. Email delivery is free; registered post is $29 extra. It covers every Australian state and territory.

Do I need a lawyer to send a Defects Notice to Your Builder in Australia?

No. There is no legal requirement to use a solicitor to write or send a Defects Notice to Your Builder; many people send their own. Claim Done drafts it for you and you approve it before it is sent.

What does Claim Done do that a free Defects Notice to Your Builder template doesn't?

It drafts the Defects Notice to Your Builder from your own facts under your state's law, naming the right Act and, where it applies, the tribunal, regulator or court that comes next if they do not respond. Nothing is sent until you approve it. Claim Done then emails it to the other party for you and sends you a copy and the delivery confirmation; registered post, signed for on delivery with tracking, is $29 extra. The key dates in the letter are listed on your dashboard.