Carpenter or Renovator Took Your Deposit and Never Came Back? Here’s How to Get Your Money

Your kitchen, bathroom, deck or built-in is half done, the tradie has your deposit, and he's stopped answering. Your rights by state, and the letter that asks for the work to be finished or your money back.

The kitchen has no benchtop. The bathroom has a bath but no taps. The deck has joists and no boards. The built-in wardrobe is a frame with doors leaning against the wall. And the carpenter, cabinet maker or renovator who took your $8,000 deposit (and probably a “materials” payment on top) has gone from “back Thursday” to read-and-ignore.

You’re living in a construction site you can’t use, you’ve paid for work that isn’t there, and the bits that were done look wrong. This is one of the most common building disputes in Australia and the law has a clear answer for it.

You have two ways to deal with this:One of them is done for you.
Do it yourself
Free — if you get it right
Hours of research
Easy to cite the wrong law
Easy to leave out a firm deadline
Done for you
Claim Done
$49 flat. That is it.
Ready in about 5 minutes
Cites the law for your state
You approve it before it is sent
Start now — $49 →
A lawyer's letter
Typically $500 to $1,500
Days to arrange
Legal advice on your matter

Your rights

Renovation, joinery, decking and cabinetry are residential building work in every state, and your contract carries statutory warranties whether the tradie wrote them in or not:

  • New South Wales. Home Building Act 1989, s 18B: work done with due care and skill, in accordance with plans, with proper materials, in compliance with law, and with due diligence within the agreed or a reasonable time. Work over $5,000 needs a written contract and a licensed contractor; over $20,000 needs Home Building Compensation cover. A deposit over 10% is illegal.
  • Victoria. Domestic Building Contracts Act 1995, s 8 warranties, plus limits on deposits (10% under $20,000; 5% over) and progress payments. Domestic Building Insurance is required over $16,000.
  • Queensland. QBCC Act 1991, Schedule 1B: written contract required over $3,300, deposit capped at 10% for a level 1 contract and 5% for a level 2 contract, or 20% where off-site work is more than half the contract price (Sch 1B s 33), implied warranties, and the Queensland Home Warranty Scheme for non-completion and defects.
  • Australian Consumer Law. s 60 (due care and skill), s 61 (fit for purpose), and s 18 (misleading conduct, which covers taking a deposit with no real intention of finishing).

An abandoned job gives you two claims at once: the money you’ve paid over and above the value of the work actually done, and the cost of rectifying whatever was done badly. Both are recoverable, and both are what a demand letter should ask for.

What to do right now

  1. Write down what you’ve paid and what you’ve got. Deposit, progress payments, cash for materials. Then walk through the job and list what is complete, what is partly done, and what is defective. Photograph all of it with dates.
  2. Check the licence. NSW Fair Trading, Building and Plumbing Commission (formerly the VBA) or QBCC licence search. Unlicensed work over the threshold is an offence, and it means the tradie can’t sue you for the balance but you can still sue them.
  3. Get a second tradie to look. Ask a licensed carpenter, cabinet maker or builder to quote on finishing the job and fixing the defects. Get it in writing. This is your cost-to-complete and cost-to-rectify evidence.
  4. Send a formal demand with an election. Give the tradie a choice: (a) written completion program within 7 days and finish by a fixed date, with defects rectified, or (b) refund of everything paid less the fair value of work done, plus the cost to rectify the defective work, within 14 days. Say that if they do neither you’ll engage another contractor and recover the extra cost.
  5. Lodge with the regulator now, not later. Fair Trading, the Building and Plumbing Commission or QBCC.
  6. Don’t pay another cent. Not for “materials”, not to “get the crew back”. If they come back and finish, you pay on completion against the original contract.
Free · 30 seconds

Ready to put it in writing?

Answer 3 quick questions to check you have the details your document needs, and see your next step.

1. Who is this about?

Give us a name — even a first name or business name is fine.

2. How much is at stake?

3. Do you have it in writing?

Your result is ready. Want a copy by email? (optional)

That email does not look right.
Leave it blank to see your result now. Add your email and we also send you the result and your next step, so you can come back to it. No spam, no list.

Continue to your $49 Renovator Demand →
Your answers are carried across — you will not have to type them again. You read and approve it before anything is sent. No card needed to start.

What if the work that was done is rubbish too?

It usually is. A tradie who walks off a job typically wasn’t doing it well before that. Half-fitted cabinetry that’s out of square, waterproofing that fails, decking on unsupported bearers. You don’t have to choose between “get them back to finish” and “claim for defects”. You can, and should, do both:

  • Defects reduce the value of work done. When you calculate “refund less value of work done”, defective work has little or no value. A kitchen carcass that has to be pulled out and redone is worth nothing to you.
  • Rectification cost is a separate head of loss. The second tradie’s quote should itemise “finish the job” and “fix what’s wrong”. Both go in the demand.
  • Don’t let them “fix it” without a program. If the tradie reappears, insist on the written completion program with dates and a defects list they’ll rectify. Vague promises are how you got here.
  • Statutory warranty periods still run. In New South Wales, 6 years for major defects and 2 years for others from completion; similar in Victoria (10 years under the Building Act) and Queensland (6 years 6 months). Abandonment doesn’t reset them, but it does mean you should get your claim in early.
Renovator Demand — $49You approve it before it is sent · Ready in about 5 min
4,272 users over the past 30 days
Putting it in writing — properly — is what turns a complaint into a claim.
I'll draft your Renovator Demand right now. Who is this about?
No card needed to start · Type a name and hit send

Who to complain to

New South Wales: NSW Fair Trading (home building complaint and licence complaint), then NCAT Home Building Division. If the tradie is insolvent or can’t be found and the job was over $20,000, the Home Building Compensation Fund. Victoria: Building and Plumbing Commission dispute resolution first (compulsory), then VCAT; report the tradie to the Building and Plumbing Commission. Queensland: QBCC complaint, Queensland Home Warranty Scheme claim for non-completion, then QCAT. Elsewhere: CBS and SACAT (South Australia), Building and Energy and SAT (Western Australia), CBOS (Tasmania).

Put the tradie on notice — $49

Claim Done drafts a Renovator / Carpenter Abandoned Job Demand that sets out what you’ve paid and what’s been done, puts the tradie to an election (written completion program within 7 days and finish by a fixed date, or refund of what you’ve paid less the value of work done plus the cost to fix the defects within 14 days) and reserves your right to finish with someone else and recover the difference.

Put the Tradie on Notice — $49 →

You review every word before it’s sent.

What happens when you put it in writing — properly

Same problem. What a prepared case looks like.

Before — doing it yourself
You explain it over the phone.
They nod, promise, and forget.
Weeks pass. Nothing is on the record.
When it escalates, it is your word against theirs.
→
After — a formal Renovator Demand
A formal Renovator Demand lands in their inbox.
It cites the law and sets a deadline.
There is now a paper trail.
They know you are serious.
Send mine — $49 →Drafted in about 5 minutes. You read and approve it before anything is sent.
Renovator Demand$49 · ready in minutes · no card to start
Start →

Getting it drafted

Can I have a Renovator / Carpenter Abandoned Job — Demand drafted for me instead of writing it myself?

Yes. Claim Done (claimdone.com.au) drafts a Renovator / Carpenter Abandoned Job — Demand from the answers you give about your situation for a flat $49 AUD. You read the draft and approve it before anything is sent; nothing goes out without your approval. Start at claimdone.com.au/begin/?service=renovator-abandoned. Claim Done is not a law firm and does not give legal advice.

How much does a Renovator / Carpenter Abandoned Job — Demand cost, and how long does it take?

$49 AUD flat, shown before you pay, with no subscription. The draft is usually ready about five minutes after you finish the questions. Email delivery is free; registered post is $29 extra. It covers every Australian state and territory.

Do I need a lawyer to send a Renovator / Carpenter Abandoned Job — Demand in Australia?

No. There is no legal requirement to use a solicitor to write or send a Renovator / Carpenter Abandoned Job — Demand; many people send their own. Claim Done drafts it for you and you approve it before it is sent.

What does Claim Done do that a free Renovator / Carpenter Abandoned Job — Demand template doesn't?

It drafts the Renovator / Carpenter Abandoned Job — Demand from your own facts under your state's law, naming the right Act and, where it applies, the tribunal, regulator or court that comes next if they do not respond. Nothing is sent until you approve it. Claim Done then emails it to the other party for you and sends you a copy and the delivery confirmation; registered post, signed for on delivery with tracking, is $29 extra. The key dates in the letter are listed on your dashboard.

Renovator Demand · $49 You approve it before it is sent