On 21 November 2026 the Western Australian Government launched a campaign aimed squarely at people buying modular homes, granny flats, tiny homes and pods. The headline is not a new law. It is a warning about an old gap: if you buy a modular building straight from the manufacturer and arrange delivery and installation yourself, the usual home building protections, including the deposit cap and home indemnity insurance, generally do not cover the off-site build.
So the question that matters before you pay anything is simple. Are you signing a home building contract with a registered builder, or are you buying goods? If you already have a contract in front of you, Claim Done’s Contract & Agreement Reviewer reads it and tells you, in plain English, which way it is structured, how much it lets the supplier take upfront and what happens if the company stops trading. You can start here.
Why WA is warning modular buyers now
The campaign follows the collapse of Perth manufacturer Bella Modular. Consumer Protection’s advice page for Bella Modular and NXT Builds customers names BCR Advisory as liquidator for Bella Modular and Auxilium Partners for NXT Builds, and tells affected people to lodge a complaint, register as a creditor and keep every contract, invoice, receipt, text message and advertisement.
At the launch, held at a Canning Vale builder’s office, Consumer Protection Commissioner Trish Blake confirmed an investigation into Bella Modular’s conduct is under way after a rise in complaints, and said no other modular builders are currently under investigation, according to WAMN News. Her practical advice was blunt: avoid large upfront payments, tie payments to construction milestones, and think about paying by credit card.
That advice only makes sense once you see the two very different legal positions a modular buyer can be in.
Two ways to buy, two very different safety nets
The government’s Modular building: Explore your options page sets the two routes side by side. Read it before you sign anything. In short:
Supply and install through a registered builder. The Home Building Contracts Act 1991 applies to home building work valued between $7,500 and $500,000. The builder cannot take a deposit of more than 6.5% before work starts. Home indemnity insurance is required for applicable contracts over $20,000. The builder carries liability for defects in workmanship and materials for six years, you have a statutory right to terminate if the builder fails to comply with the Act, and low-cost complaint resolution is available through the Building Commissioner or the State Administrative Tribunal.
Buying direct from the manufacturer and arranging your own transport and installation. The Act’s protections do not apply to the construction of the modular home. The off-site build is not covered by home indemnity insurance. The manufacturer can lawfully ask for whatever deposit the contract says. There is no statutory right to terminate for non-compliance, so ordinary contract law applies. And the low-cost building dispute process is not available for manufacturing disputes.
You still have the Australian Consumer Law in the second case. A business must not take payment and then fail to supply. But your path to the money is slower and less certain, and if the company goes under, it may lead nowhere at all.
Ready to put it in writing?
Answer 3 quick questions to check you have the details your document needs, and see your next step.
1. Who is this about?
2. How much is at stake?
3. Do you have it in writing?
Your result is ready. Want a copy by email? (optional)
What that gap looks like in dollars
Here is a worked example using the rules on those government pages. The figures are illustrative, not from any real case.
Take a $150,000 granny flat. Under a supply-and-install contract with a registered builder, the most the builder can take before work starts is 6.5%, which is $9,750. Industry publication The Good Builder notes that the regulations cap insurance cover for a lost deposit at $40,000, so that whole $9,750 sits inside the cover if the builder becomes insolvent.
Now buy the same building direct, at a 30% deposit because that is what the supplier’s form asks for. That is $45,000 paid before a wall is built. No cap applies to it, no insurance policy stands behind it, and if the manufacturer collapses, you join the queue of unsecured creditors.
The difference between those two contracts is not the building. It is $35,250 of unprotected money, decided by one structural choice most buyers never notice on the paperwork.
Ready to put it in writing?
Claim Done drafts your letter, application, response or agreement from your answers, from A$29. You review and approve it before anything is sent or lodged. No lawyer's retainer, no subscription.
Before you sign: five things to check in a modular contract
Consumer Protection’s modular homes page (updated 23 November 2026) and the government guide boil down to a short checklist. Run your contract against it.
- Who is the contracting party, and are they a registered builder? If the contract is with a manufacturer only and leaves transport and installation to you, you are on the unprotected side of the line.
- How big is the deposit? Pay only a small deposit to secure the contract, and negotiate progress payments linked to delivery of materials, manufacturing stages and installation.
- What proof do you get before each payment? Ask for evidence that each stage is complete, such as a site visit to see your materials or the build in progress.
- Is there a completion timeframe? A date in writing gives you something concrete to enforce later.
- Does the supplier confirm compliance in writing? Consumer Protection warns against “DIY” or “permit-free” claims: you still have to meet planning, safety and building requirements, and you may need a registered builder (or approval as an owner-builder) where a permit is required and a habitable building is worth more than $20,000.
Also check for any clause that limits your chargeback rights. Consumer Protection’s credit card chargeback page says a term like that is likely to be an unfair contract term.
If the contract is long, written by the supplier and full of payment schedules, this is exactly what a contract review is for. Our earlier piece on WA’s 6.5% deposit cap covers what to do when a registered builder has already taken too much.
How you pay matters as much as how much
The Commissioner’s credit card suggestion is worth taking seriously. According to Consumer Protection, a chargeback can reverse a card payment when goods or services are not supplied within the agreed time, and insolvency is one of the listed situations. It is available on credit cards and on debit cards where the credit option is selected. It is not available for cash, BPAY, direct debit, bank transfer or cheque.
Two cautions. Card schemes set time limits, so you have to act quickly once something goes wrong. And the government guide warns the process can take several months; the general insolvency page says up to a year. Still, a slow route to your money beats no route.
Many modular deposits are paid by bank transfer because suppliers prefer it. If you are asked to transfer a large sum, that is the moment to push back and ask for a card option or a smaller first payment.
Already paid and things have gone quiet?
The government’s Support when needed page sets out the steps, and every one of them starts with writing.
If the manufacturer or transport company has not delivered, lodge a complaint with Consumer Protection (1300 30 40 54) and, if you paid by card, ask your card provider about a chargeback straight away.
If the home arrived damaged or not as described, put the problem to the business in writing, state the outcome you want (repair, replacement or compensation) and keep photos, the contract, emails and receipts.
If a registered builder is not doing the installation work properly, the Building Commissioner route opens up, but you must first give the builder written notice that describes the complaint, states the remedy you want, identifies your evidence and says you intend to complain if it is not resolved. Allow at least 14 days for a response and keep a copy of what you sent. Contract complaints generally have to be lodged within three years, and faulty-work complaints within six years of completion. A lodgement fee applies; check the current amount with Building and Energy.
A clear, dated letter does a lot of work here. It fixes the timeline, it shows a regulator you gave the business a fair chance, and it is the document a liquidator, card provider or tribunal will ask to see. For a builder who has stopped work, a Notice to Remedy Breach puts the failure and the deadline in writing. For a supplier who took money and did not deliver, a Letter of Demand sets out what you paid, what you received and the date you expect the money back.
If the company has already collapsed
Once a company is in administration or liquidation, a demand letter will not move the money. Consumer Protection’s guide on when a business goes bust sets the order:
- Claim your goods if you can. You may be able to claim products you contracted for and paid in full, or by paying the liquidator the balance.
- Request a chargeback if you paid by card.
- Register as an unsecured creditor with the administrator or liquidator, whose details are on ASIC’s published notices.
Be realistic about that last step. Unsecured creditors are paid after secured creditors such as banks, employee entitlements and the costs of the administration, and the government’s own guidance says there may be limited or no funds left. In most cases you also cannot start or continue court action against a company in liquidation without the court’s permission. That is why the protection has to be built in at the contract stage.
How Claim Done helps
Claim Done is not a law firm. It is a document service: you answer questions, upload what you have, and its document engine drafts the document for you. You review and approve it before anything goes anywhere, and it is then sent by email.
For a modular purchase that has not been signed yet, the right tool is the Contract & Agreement Reviewer. Upload the supplier’s contract and quote, and you get a plain-English review that flags who you are actually contracting with, whether it reads as a home building contract or a supply-only sale, the size and timing of payments, completion dates, what happens on delay or insolvency, and any terms that try to cut back your rights. You then go back to the supplier with specific changes to ask for, such as a smaller deposit, milestone payments or a card payment option. See the current price on our pricing page; it is a flat fee with no subscription, a fraction of what a project like this costs if the payment schedule is wrong. If you would like to read more first, our contract reviews guide explains what gets checked.
If you have already paid and the supplier or builder has stopped responding, the Notice to Remedy Breach and Letter of Demand above are the documents to start with.
Your next step: start your contract review on Claim Done, choose the Contract & Agreement Reviewer, and upload the modular supplier’s contract before you transfer the deposit. You will see the review, decide what to push back on, and only then decide whether to sign.
Frequently asked questions
Does home indemnity insurance cover a modular home in WA?
Only in some arrangements. The WA Government's modular guide says home indemnity insurance is required for applicable contracts with a registered builder valued over $20,000, but the off-site build is not covered when you buy direct from the manufacturer and arrange your own transport and installation. Check which arrangement your contract creates before you pay.
Is there a deposit limit when buying a granny flat or pod in WA?
Under a home building contract with a registered builder valued between $7,500 and $500,000, the builder cannot take more than 6.5% before work starts. If you buy the building direct from a manufacturer, the government guide says the manufacturer can lawfully seek the deposit agreed in the contract, so the size of the deposit comes down to what you negotiate.
What should I do if my modular home supplier has gone into liquidation?
Consumer Protection advises lodging a complaint, requesting a chargeback if you paid by card, and registering as an unsecured creditor with the liquidator, whose details appear on ASIC's published notices. Keep every contract, invoice, receipt and message. Unsecured creditors are paid last, so there may be little or nothing left to distribute.
Who do I complain to about a modular home problem in WA?
Consumer Protection (1300 30 40 54) handles consumer complaints, including failure to deliver and misleading claims. Building and Energy (1300 489 099) handles complaints about home building work contracts between $7,500 and $500,000 and building work of any value. Before a building service complaint you must give the builder written notice and at least 14 days to respond.
Can I pay a modular home deposit by credit card for protection?
The Consumer Protection Commissioner has suggested it. A chargeback can reverse a card payment where goods or services are not supplied, including on insolvency, but it is not available for bank transfers, BPAY, direct debit or cash. Card schemes set time limits and the process can take months, so contact your card provider as soon as a problem appears.
What happens when you put it in writing — properly
Same problem. What a prepared case looks like.
Getting it drafted
Can Claim Done review my contract for me?
Yes. Claim Done (claimdone.com.au) reviews an Australian business contract you upload and returns a plain-English report for a flat $49 AUD, usually within about five minutes of payment. Start at claimdone.com.au/begin/?service=contract-review. Claim Done is not a law firm and does not give legal advice.
How much does a contract review cost, and how long does it take?
$49 AUD flat, shown before you pay, with no subscription. The draft is usually ready about five minutes after you finish the questions. It covers every Australian state and territory.
What does the contract review report cover?
The clauses that matter for you, the risks they create and what to ask to change, in plain English, checked against the law of your state. It is a document review, not legal advice.